Calyco BESS configurator

Design Your C&I Sodium-ion BESS

Saving…
Project summary
Step 1 of 5 · Your project0%

Your project

4 questions to confirm, 2 optional.

Required. Everything else is optional and already answered with a Calyco default you can change.

1.Required BESS capacity(required)

Specify both energy capacity and power capacity; duration is derived from MWh ÷ MW.

2.Storage duration(required)

Clarify whether required capacity is usable output or nominal battery capacity.

3.Application and use case(required)

Use case drives PCS sizing, cycling, warranty and EMS logic.

15.Project location(required)

Location affects logistics, ambient conditions, product selection and compliance.

Optional: 2 more your project detailsAlready answered with the defaults below. Review or change them, or carry on — nothing here is required.
Container or unit format
No preference — recommend based on MW/MWh
Grid connection or evacuation voltage
Not yet confirmed
Open to change any of these
14.Container or unit format

Physical layout affects the number of units, civil works and installation planning.

16.Grid connection or evacuation voltage

Needed to define PCS, transformer and switchgear architecture.